India’s Next Investment Cycle Will Shape Its Carbon Future
Oct. 28, 2026
Context
The United Nations Environment Programme (UNEP) has warned that the world could cross the 1.5°C global warming threshold within the next few years, increasing pressure for faster decarbonisation.
India must balance economic growth with climate commitments, but its unfinished infrastructure development offers an opportunity to adopt low-carbon growth from the beginning.
According to NITI Aayog, 86% of India’s building stock in 2070 is yet to be constructed. Total floor space is projected to rise from 18 billion square metres in 2020 to 42 billion by 2070.
Steel capacity is targeted to reach 300 million tonnes by 2030–31, while cement production could increase to 660 million tonnes by 2030.
These projections demonstrate the need to integrate sustainability into infrastructure planning to prevent long-term environmental damage.
The Advantage of Choice
India’s Infrastructure Opportunity
India’s infrastructure deficit is often considered an obstacle to decarbonisation because demand for steel, cement and electricity will continue to grow.
However, much of its future infrastructure remains a choice rather than an inheritance.
India can incorporate energy efficiency and cleaner technologies into new investments, avoiding costly retrofits and stranded assets.
The International Energy Agency (IEA) estimates that approximately 80% of the building stock advanced economies will use in 2050 already exists.
In the European Union, 85% of buildings predate 2000, around three-quarters perform poorly in energy efficiency, and only about 1% are renovated annually.
Strengthening Building Regulations
India can avoid similar problems by adopting sustainable building designs from the outset.
The Bureau of Energy Efficiency (BEE) reports that 27 States have notified the Energy Conservation Building Code (ECBC) 2017, but only 21 have legally incorporated it.
The Energy Conservation and Sustainable Building Code (ECSBC) 2024 and Eco-Niwas Samhita (ENS) 2024 provide updated standards for commercial and residential buildings.
States should integrate these codes into building permits, occupancy certificates and grid connections, making compliance enforceable rather than voluntary.
The Issue in the Power Sector
Expanding Transmission and Storage
India has expanded renewable-energy generation rapidly, but transmission infrastructure has not kept pace.
The IEA estimates that transmission bottlenecks have constrained approximately 60 GW of renewable capacity.
Meanwhile, the Ministry of Power plans around 590 GW of generation additions between 2023 and 2032.
Without adequate transmission and storage, renewable electricity may not reach consumption centres reliably.
Electrification of transport, cooling and industry will further increase demand.
Therefore, transmission networks and energy storage must be developed alongside, or sometimes ahead of, new generation capacity.
Decarbonising Steel and Cement
Decarbonising steel and cement is more difficult because technologies such as hydrogen-based green steel and large-scale carbon capture remain economically or technologically challenging.
Premature technology mandates could increase costs and lock industries into inefficient processes.
Using Public Procurement to Encourage Green Industry
Instead, public procurement can create demand for low-emission materials.
Government agencies, Indian Railways and the National Highways Authority of India purchase substantial quantities of steel and cement, giving them considerable influence over industrial practices.
India’s green-steel taxonomy and proposed aggregated procurement through competitive bidding offer a practical approach.
Tenders can establish emissions-intensity thresholds without prescribing production methods.
Competition would encourage innovation, reveal the additional cost of greener materials and allow standards to become progressively stricter.
Aligning these thresholds with the Carbon Credit Trading Scheme (CCTS) would ensure consistent policy incentives and encourage industrial decarbonisation.
Costs and Risks
Addressing High Financing Costs
The IEA estimates that India’s cost of capital for grid-scale renewable projects is about 80% higher than in advanced economies.
High upfront costs and expensive borrowing can make otherwise viable clean-energy projects unattractive.
Targeted support through payment-security mechanisms, partial credit guarantees and concessional debt can reduce financing and payment risks, encouraging private investment.
Balancing Public Support and Financial Risks
Public finance must be used carefully. Subsidising unproven technologies could transfer commercial risks to taxpayers.
Governments should distinguish between mature technologies requiring financial support and emerging technologies that still face significant technical and economic uncertainty.
A balanced financing strategy can promote clean infrastructure while protecting public resources and maintaining financial discipline.
Conclusion
India must invest heavily to build its future economy, but the environmental consequences will depend on the choices made today.
Efficient infrastructure, renewable energy and sustainable construction should be prioritised wherever technologies are mature.
By making informed investment decisions today, the country can reduce future costs, strengthen energy security, limit emissions and achieve sustainable economic growth.
Dear Student,
You have still not entered your mailing address. Please enter the address where all the study materials will be sent to you. (If applicable).